Analysis of extreme values of the economic efficiency indicators of transport infrastructure projects

dc.contributor.authorKorytárová, Janacs
dc.contributor.authorVaňková, Luciecs
dc.coverage.issue1cs
dc.coverage.volume251cs
dc.date.issued2017-09-27cs
dc.description.abstractPaper builds on previous research of the authors into the evaluation of economic efficiency of transport infrastructure projects evaluated by the economic efficiency ratio - NPV, IRR and BCR. Values of indicators and subsequent outputs of the sensitivity analysis show extremely favourable values in some cases. The authors dealt with the analysis of these indicators down to the level of the input variables and examined which inputs have a larger share of these extreme values. NCF for the calculation of above mentioned ratios is created by benefits that arise as the difference between zero and investment options of the project (savings in travel and operating costs, savings in travel time costs, reduction in accident costs and savings in exogenous costs) as well as total agency costs. Savings in travel time costs which contribute to the overall utility of projects by more than 70% appear to be the most important benefits in the long term horizon. This is the reason why this benefit emphasized. The outcome of the article has resulted how the particular basic variables contributed to the total robustness of economic efficiency of these project.en
dc.description.abstractPaper builds on previous research of the authors into the evaluation of economic efficiency of transport infrastructure projects evaluated by the economic efficiency ratio - NPV, IRR and BCR. Values of indicators and subsequent outputs of the sensitivity analysis show extremely favourable values in some cases. The authors dealt with the analysis of these indicators down to the level of the input variables and examined which inputs have a larger share of these extreme values. NCF for the calculation of above mentioned ratios is created by benefits that arise as the difference between zero and investment options of the project (savings in travel and operating costs, savings in travel time costs, reduction in accident costs and savings in exogenous costs) as well as total agency costs. Savings in travel time costs which contribute to the overall utility of projects by more than 70% appear to be the most important benefits in the long term horizon. This is the reason why this benefit emphasized. The outcome of the article has resulted how the particular basic variables contributed to the total robustness of economic efficiency of these project.en
dc.formattextcs
dc.format.extent1-6cs
dc.format.mimetypeapplication/pdfcs
dc.identifier.citationIOP Conference Series: Materials Science and Engineering. 2017, vol. 251, issue 1, p. 1-6.en
dc.identifier.doi10.1088/1757-899X/251/1/012043cs
dc.identifier.issn1757-8981cs
dc.identifier.orcid0000-0002-0046-0141cs
dc.identifier.orcid0000-0001-9440-8936cs
dc.identifier.other140842cs
dc.identifier.researcheridE-1253-2019cs
dc.identifier.researcheridAAD-8171-2019cs
dc.identifier.scopus23090547100cs
dc.identifier.scopus57197743906cs
dc.identifier.urihttp://hdl.handle.net/11012/137162
dc.language.isoencs
dc.publisherIOP Publishingcs
dc.relation.ispartofIOP Conference Series: Materials Science and Engineeringcs
dc.relation.urihttp://iopscience.iop.org/article/10.1088/1757-899X/251/1/012043cs
dc.rightsCreative Commons Attribution 3.0 Unportedcs
dc.rights.accessopenAccesscs
dc.rights.sherpahttp://www.sherpa.ac.uk/romeo/issn/1757-8981/cs
dc.rights.urihttp://creativecommons.org/licenses/by/3.0/cs
dc.subjectAnalysis of extreme values of the economic efficiency indicators of transport infrastructure projectsen
dc.subjectAnalysis of extreme values of the economic efficiency indicators of transport infrastructure projects
dc.titleAnalysis of extreme values of the economic efficiency indicators of transport infrastructure projectsen
dc.title.alternativeAnalysis of extreme values of the economic efficiency indicators of transport infrastructure projectsen
dc.type.driverarticleen
dc.type.statusPeer-revieweden
dc.type.versionpublishedVersionen
sync.item.dbidVAV-140842en
sync.item.dbtypeVAVen
sync.item.insts2025.10.14 14:23:24en
sync.item.modts2025.10.14 09:39:15en
thesis.grantorVysoké učení technické v Brně. Fakulta stavební. Ústav stavební ekonomiky a řízenícs

Files

Original bundle

Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Korytarova_2017_IOP_Conf._Ser.__Mater._Sci._Eng._251_012043.pdf
Size:
896.16 KB
Format:
Adobe Portable Document Format
Description:
Korytarova_2017_IOP_Conf._Ser.__Mater._Sci._Eng._251_012043.pdf