Quality and reliability of IFC/BIM models for public educational facilities construction projects via clash detection

Loading...
Thumbnail Image

Authors

Juszczyk, Michał
Vaisnoras, Mantas
Kontrimovičius, Robertas
Hanák, Tomáš
Łukaszewska, Hanna
Ustinovichius, Leonas

Advisor

Referee

Mark

Journal Title

Journal ISSN

Volume Title

Publisher

VILNIUS GEDIMINAS TECH UNIV
Altmetrics

Abstract

This study investigates the reliability of monodiscipline IFC/BIM models in public construction projects of educational facilities through advanced clash detection and quantitative analysis. Data were collected from BIM models of two kindergartens and a school in Vilnius, Lithuania, representing different design disciplines. A mixed-methods approach was employed to analyse the number, types, and geometric characteristics of detected clashes. The research introduces innovative metrics, such as the Relative Quality Coefficient (RQC), Relative Uncertainty Coefficient (RUC), and Modified Relative Quality Coefficient (MRQC), to assess model quality and reliability quantitatively. The findings reveal a direct relationship between model complexity, clash detection precision, and the number of identified clashes, underscoring the importance of enhanced quality control measures in IFC/BIM models for public procurement. The study concludes that the implementation of these novel metrics can enhance the reliability of IFC/BIM models, thereby optimizing the design and construction process.
This study investigates the reliability of monodiscipline IFC/BIM models in public construction projects of educational facilities through advanced clash detection and quantitative analysis. Data were collected from BIM models of two kindergartens and a school in Vilnius, Lithuania, representing different design disciplines. A mixed-methods approach was employed to analyse the number, types, and geometric characteristics of detected clashes. The research introduces innovative metrics, such as the Relative Quality Coefficient (RQC), Relative Uncertainty Coefficient (RUC), and Modified Relative Quality Coefficient (MRQC), to assess model quality and reliability quantitatively. The findings reveal a direct relationship between model complexity, clash detection precision, and the number of identified clashes, underscoring the importance of enhanced quality control measures in IFC/BIM models for public procurement. The study concludes that the implementation of these novel metrics can enhance the reliability of IFC/BIM models, thereby optimizing the design and construction process.

Description

Citation

Journal of Civil Engineering and Management. 2025, vol. 31, issue 1, p. 1-19.
https://journals.vilniustech.lt/index.php/JCEM/article/view/23114

Document type

Peer-reviewed

Document version

Published version

Date of access to the full text

Language of document

en

Study field

Comittee

Date of acceptance

Defence

Result of defence

Endorsement

Review

Supplemented By

Referenced By

Creative Commons license

Except where otherwised noted, this item's license is described as Creative Commons Attribution 4.0 International
Citace PRO