Effective Use of Tower Cranes over Time in the Selected Construction Process

dc.contributor.authorMotyčka, Vítcs
dc.contributor.authorGašparík, Jozefcs
dc.contributor.authorPřibyl, Otocs
dc.contributor.authorŠtěrba, Martincs
dc.contributor.authorKurková, Ditacs
dc.contributor.authorKantová, Radkacs
dc.coverage.issue4cs
dc.coverage.volume12cs
dc.date.issued2022-04-02cs
dc.description.abstractThe quality of preparations carried out before building work commences has a significant impact on the smooth running and overall financial costs of a construction project. The use of construction machinery, which is crucial with regard to the efficiency of the construction process, plays an important role. In building construction, the machines in question are mainly tower cranes. The paper presents a new method for assessing the utilisation of tower cranes over time during the construction of reinforced concrete monolithic structures. The method, which contributes to the efficient utilisation of such cranes, is based on a mathematical simulation model that predicts the work cycles of a tower crane during a work shift when work is being performed on individual construction sub-processes. Construction sub-processes are analysed in detail with regard to the service provided to them by a tower crane. Data can also be obtained from binding construction schedules and boundary conditions, which in every case are for a specific executed construction project. The simulation model of the work of tower cranes has been developed for use in software applications. The created application expands the possibilities of smart construction site design in a digital environment and can also be used directly from an internet browser.en
dc.formattextcs
dc.format.extent1-21cs
dc.format.mimetypeapplication/pdfcs
dc.identifier.citationBuildings. 2022, vol. 12, issue 4, p. 1-21.en
dc.identifier.doi10.3390/buildings12040436cs
dc.identifier.issn2075-5309cs
dc.identifier.orcid0000-0001-6443-8827cs
dc.identifier.orcid0000-0002-3286-8475cs
dc.identifier.orcid0000-0003-3071-8489cs
dc.identifier.orcid0000-0002-3131-119Xcs
dc.identifier.orcid0000-0003-4916-579Xcs
dc.identifier.other177507cs
dc.identifier.researcheridM-3707-2018cs
dc.identifier.scopus56491234100cs
dc.identifier.urihttp://hdl.handle.net/11012/204121
dc.language.isoencs
dc.publisherMDPIcs
dc.relation.ispartofBuildingscs
dc.relation.urihttps://www.mdpi.com/2075-5309/12/4/436cs
dc.rightsCreative Commons Attribution 4.0 Internationalcs
dc.rights.accessopenAccesscs
dc.rights.sherpahttp://www.sherpa.ac.uk/romeo/issn/2075-5309/cs
dc.rights.urihttp://creativecommons.org/licenses/by/4.0/cs
dc.subjectpre-construction phaseen
dc.subjecttower craneen
dc.subjecttower crane designen
dc.subjectsmart construction siteen
dc.titleEffective Use of Tower Cranes over Time in the Selected Construction Processen
dc.type.driverarticleen
dc.type.statusPeer-revieweden
dc.type.versionpublishedVersionen
sync.item.dbidVAV-177507en
sync.item.dbtypeVAVen
sync.item.insts2025.02.03 15:46:11en
sync.item.modts2025.01.17 20:33:12en
thesis.grantorVysoké učení technické v Brně. Fakulta stavební. Ústav technologie, mechanizace a řízení stavebcs
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
buildings1200436v2.pdf
Size:
1.91 MB
Format:
Adobe Portable Document Format
Description:
buildings1200436v2.pdf