Evaluation of different solutions of faulted phase earthing technique for an earth fault current limitation

dc.contributor.authorTopolánek, Davidcs
dc.contributor.authorToman, Petrcs
dc.contributor.authorPtáček, Michalcs
dc.contributor.authorDvořák, Jaromírcs
dc.coverage.issue1cs
dc.coverage.volumeVol. 2017cs
dc.date.issued2017-06-12cs
dc.description.abstractThe study is focused on evaluation of different types of prototypes of automatics for additional faulted phase earthing (FPE), which are used for earth fault (EF) current reduction in resonant earthed distribution network. Three prototypes of these automatics have been installed in Czech distribution network, the first one utilises direct connection of faulty phase–to-earthing system of supply substation, the second one utilises connection through resistor and the last one through reactor. The contribution is mainly focused on detail analysis of operational differences of these types of FPE systems based on case study of compensated distribution network. The main aim is to specify and describe benefits and disadvantages of individual FPE applications. The results could be used for evaluation of best solution of FPE application which could be chosen for an EF current reduction in compensated distribution network.en
dc.description.abstractPříspěvek je zaměřen na posouzení variantního řešení prototypů automatiky přizemnění postižené fáze, která se využívá pro omezení úrovně poruchového proudu během zemního spojení. V rámci české distribuční soustavy byly instalovány tři typy těchto automatik využívající přímého spojení postižené fáze se zemnící soustavou, přizemnění přes odporník a přizemnění přes reaktor. Právě tyto tři způsoby jsou na základě simulací obecné distribuční soustavy testovány a zhodnoceny.cs
dc.formattextcs
dc.format.extent1-5cs
dc.format.mimetypeapplication/pdfcs
dc.identifier.citationCIRED, International Conference and Exhibition on Electricity Distribution. 2017, vol. Vol. 2017, issue 1, p. 1-5.en
dc.identifier.doi10.1049/oap-cired.2017.0817cs
dc.identifier.isbn978-1-78561-483-5cs
dc.identifier.issn2032-9644cs
dc.identifier.orcid0000-0001-9754-6867cs
dc.identifier.orcid0000-0002-1708-009Xcs
dc.identifier.orcid0000-0001-8923-7693cs
dc.identifier.other141733cs
dc.identifier.researcheridE-2120-2018cs
dc.identifier.researcheridO-2269-2014cs
dc.identifier.researcheridA-1636-2016cs
dc.identifier.scopus26650289500cs
dc.identifier.scopus56423885700cs
dc.identifier.scopus55809485900cs
dc.identifier.urihttp://hdl.handle.net/11012/83841
dc.language.isoencs
dc.publisherIETcs
dc.relation.ispartofCIRED, International Conference and Exhibition on Electricity Distributioncs
dc.relation.urihttps://ieeexplore.ieee.org/abstract/document/8316164/cs
dc.rightsCreative Commons Attribution 3.0 Unportedcs
dc.rights.accessopenAccesscs
dc.rights.sherpahttp://www.sherpa.ac.uk/romeo/issn/2032-9644/cs
dc.rights.urihttp://creativecommons.org/licenses/by/3.0/cs
dc.subjectearth fault currenten
dc.subjectfaulty phase earthingen
dc.subjectcompensated networken
dc.subjectsimulationen
dc.subjecttest networken
dc.subjectzemní poruchový proud
dc.subjectpřizemnění postižené fáze
dc.subjectkompenzovaná soustavy
dc.subjectsimulace
dc.subjecttestovací soustava
dc.titleEvaluation of different solutions of faulted phase earthing technique for an earth fault current limitationen
dc.title.alternativeVyhodnocení rozdílných způsobů přizemnění postižené fáze pro redukci zemního prouducs
dc.type.driverconferenceObjecten
dc.type.statusPeer-revieweden
dc.type.versionpublishedVersionen
sync.item.dbidVAV-141733en
sync.item.dbtypeVAVen
sync.item.insts2025.02.03 15:39:07en
sync.item.modts2025.01.17 18:34:59en
thesis.grantorVysoké učení technické v Brně. Fakulta elektrotechniky a komunikačních technologií. Centrum výzkumu a využití obnovitelných zdrojů energiecs
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
OAPCIRED.2017.0817.pdf
Size:
493.58 KB
Format:
Adobe Portable Document Format
Description:
OAPCIRED.2017.0817.pdf