Share of the volume of work types and financial costs according to the stages of construction of reinforced concrete monolithic buildings
dc.contributor.author | Doubek, Rostislav | cs |
dc.coverage.issue | 1 | cs |
dc.coverage.volume | 867 | cs |
dc.date.issued | 2020-10-08 | cs |
dc.description.abstract | The aim of the paper is to evaluate the technological and economic demands on the construction of multi-storey reinforced concrete monolithic buildings for administrative purposes incorporating the stages of construction, technological stages and selected partial construction processes. The entry criteria for objects that are included in monitoring and evaluation are their identical location, used technologies, mechanization, built-in materials and there purpose. The purpose of the paper is to prepare tables for the professional and academic public for a rough idea of the proportional representation of time and financial consumption in the construction of this type of object, for selected stages of construction, technological stages and selected partial construction processes. | en |
dc.format | text | cs |
dc.format.extent | 1-7 | cs |
dc.format.mimetype | application/pdf | cs |
dc.identifier.citation | IOP Conference Series: Materials Science and Engineering. 2020, vol. 867, issue 1, p. 1-7. | en |
dc.identifier.doi | 10.1088/1757-899X/867/1/012006 | cs |
dc.identifier.issn | 1757-8981 | cs |
dc.identifier.orcid | 0000-0003-1756-8084 | cs |
dc.identifier.other | 168056 | cs |
dc.identifier.uri | http://hdl.handle.net/11012/196536 | |
dc.language.iso | en | cs |
dc.publisher | IOP Publishing | cs |
dc.relation.ispartof | IOP Conference Series: Materials Science and Engineering | cs |
dc.relation.uri | https://iopscience.iop.org/article/10.1088/1757-899X/867/1/012006 | cs |
dc.rights | Creative Commons Attribution 3.0 Unported | cs |
dc.rights.access | openAccess | cs |
dc.rights.sherpa | http://www.sherpa.ac.uk/romeo/issn/1757-8981/ | cs |
dc.rights.uri | http://creativecommons.org/licenses/by/3.0/ | cs |
dc.subject | stages of construction | en |
dc.subject | technological stages | en |
dc.title | Share of the volume of work types and financial costs according to the stages of construction of reinforced concrete monolithic buildings | en |
dc.type.driver | conferenceObject | en |
dc.type.status | Peer-reviewed | en |
dc.type.version | publishedVersion | en |
sync.item.dbid | VAV-168056 | en |
sync.item.dbtype | VAV | en |
sync.item.insts | 2025.02.03 15:46:09 | en |
sync.item.modts | 2025.01.17 18:38:44 | en |
thesis.grantor | Vysoké učení technické v Brně. Fakulta stavební. Ústav technologie, mechanizace a řízení staveb | cs |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- Doubek_2020_IOP_Conf._Ser. _Mater._Sci._Eng._867_012006.pdf
- Size:
- 1.01 MB
- Format:
- Adobe Portable Document Format
- Description:
- Doubek_2020_IOP_Conf._Ser. _Mater._Sci._Eng._867_012006.pdf