Laboratory testing of the communication based protection relays

Loading...
Thumbnail Image

Date

Authors

Daboul, M.
Wasserbauer, V.

Advisor

Referee

Mark

Journal Title

Journal ISSN

Volume Title

Publisher

Vysoké učení technické v Brně, Fakulta elektrotechniky a komunikačních technologií

ORCID

Abstract

The proper operation of control and protection applications in Substation Automation System (SAS) demands very high-speed and reliable communications that has being achieved by using IEC 61850. Moreover, the practical implementation and testing of protection scheme requires a communication system that can be conventional or high-speed peer-to-peer communication. This paper presents the evaluation of the performance advantage of GOOSE (Generic Object Oriented Substation Event) message over its conventional hard-wired counterpart for the same relays protection.

Description

Citation

Proceedings of the 21st Conference STUDENT EEICT 2015. s. 413-417. ISBN 978-80-214-5148-3
http://www.feec.vutbr.cz/EEICT/

Document type

Peer-reviewed

Document version

Published version

Date of access to the full text

Language of document

en

Study field

Comittee

Date of acceptance

Defence

Result of defence

DOI

Endorsement

Review

Supplemented By

Referenced By

Citace PRO