Anchorage length of patented wire cables in prestressed bridge girders

dc.contributor.authorSvoboda, Adamcs
dc.contributor.authorKlusáček, Ladislavcs
dc.contributor.authorNečas, Radimcs
dc.contributor.authorKoláček, Jancs
dc.contributor.authorStrnad, Jiřícs
dc.contributor.authorOlšák, Martincs
dc.coverage.issue3cs
dc.coverage.volume65cs
dc.date.accessioned2022-01-11T11:54:32Z
dc.date.available2022-01-11T11:54:32Z
dc.date.issued2021-12-30cs
dc.description.abstractThis paper briefly describes the methodology, performance and the obtained results of unique experiments performed on original I-73 precast bridge girders. The main objective of the experiments was to determine the actual anchorage length of corroded-through fully grouted prestressing reinforcement (prestressing wires), which is important for determination of the residual load-bearing capacity of prestressed structures. Observation probes leading all the way to the prestressing wires were drilled on selected sections of the girders along the length of the prestressing reinforcement. Optical image acquisition devices were then installed at these probes. Subsequently, controlled breakage of the patented wires (corrosion failure simulation) and observation of the changes that occurred in the prestressing wires after relief of stress were carried out. Evaluation of the experiments was then performed by analyzing the images obtained before and after the prestressing reinforcement failure.en
dc.formattextcs
dc.format.extent92-96cs
dc.format.mimetypeapplication/pdfcs
dc.identifier.citationKoroze a ochrana materiálů. 2021, vol. 65, issue 3, p. 92-96.en
dc.identifier.doi10.2478/kom-2021-0012cs
dc.identifier.issn0452-599Xcs
dc.identifier.other175708cs
dc.identifier.urihttp://hdl.handle.net/11012/203276
dc.language.isoencs
dc.publisherSciendocs
dc.relation.ispartofKoroze a ochrana materiálůcs
dc.relation.urihttps://www.sciendo.com/article/10.2478/kom-2021-0012cs
dc.rightsCreative Commons Attribution-NonCommercial-NoDerivatives 4.0 Internationalcs
dc.rights.accessopenAccesscs
dc.rights.sherpahttp://www.sherpa.ac.uk/romeo/issn/0452-599X/cs
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/cs
dc.subjectpatented wire cablesen
dc.subjectcorrosionen
dc.subjectanchorage lengthen
dc.subjectprestressed concreteen
dc.subjectI-73 precast bridge girderen
dc.titleAnchorage length of patented wire cables in prestressed bridge girdersen
dc.type.driverarticleen
dc.type.statusPeer-revieweden
dc.type.versionpublishedVersionen
sync.item.dbidVAV-175708en
sync.item.dbtypeVAVen
sync.item.insts2022.03.04 20:55:33en
sync.item.modts2022.03.04 20:15:01en
thesis.grantorVysoké učení technické v Brně. Fakulta stavební. Ústav betonových a zděných konstrukcícs
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
10.2478_kom20210012.pdf
Size:
2.83 MB
Format:
Adobe Portable Document Format
Description:
10.2478_kom20210012.pdf