Optimizing Sludge Management at the Municipal Solid Waste Incinerator—A Case Study
Loading...
Date
Authors
Raček, Jakub
Anferova, Natalia
Hluštík, Petr
Hlavínek, Petr
Advisor
Referee
Mark
Journal Title
Journal ISSN
Volume Title
Publisher
MDPI AG
Altmetrics
Abstract
Sludge disposal is becoming an issue at the municipal solid waste incinerator (MSWI), especially for environmental and economic reasons. This paper describes a case study of the optimization of the sludge management (SM) system at the MSWI in the Czech Republic. The original concept of SM at MSWI was designed as waste-free. However, the present operation indicates that there is a need to carry out regular extraction and disposal of sludge settling at the bottom ash tank and the bottom of the retention basin. The current status of SM causes problems not only in terms of operation but it also entails significant financial costs given the necessary regular cleaning of tanks. The aim of the applied research presented in this paper is SM optimization by a mobile sludge dewatering (DW) press unit with optimal polymer combination for DW.
Sludge disposal is becoming an issue at the municipal solid waste incinerator (MSWI), especially for environmental and economic reasons. This paper describes a case study of the optimization of the sludge management (SM) system at the MSWI in the Czech Republic. The original concept of SM at MSWI was designed as waste-free. However, the present operation indicates that there is a need to carry out regular extraction and disposal of sludge settling at the bottom ash tank and the bottom of the retention basin. The current status of SM causes problems not only in terms of operation but it also entails significant financial costs given the necessary regular cleaning of tanks. The aim of the applied research presented in this paper is SM optimization by a mobile sludge dewatering (DW) press unit with optimal polymer combination for DW.
Sludge disposal is becoming an issue at the municipal solid waste incinerator (MSWI), especially for environmental and economic reasons. This paper describes a case study of the optimization of the sludge management (SM) system at the MSWI in the Czech Republic. The original concept of SM at MSWI was designed as waste-free. However, the present operation indicates that there is a need to carry out regular extraction and disposal of sludge settling at the bottom ash tank and the bottom of the retention basin. The current status of SM causes problems not only in terms of operation but it also entails significant financial costs given the necessary regular cleaning of tanks. The aim of the applied research presented in this paper is SM optimization by a mobile sludge dewatering (DW) press unit with optimal polymer combination for DW.
Description
Keywords
Citation
Document type
Peer-reviewed
Document version
Published version
Date of access to the full text
Language of document
en
Study field
Comittee
Date of acceptance
Defence
Result of defence
Endorsement
Review
Supplemented By
Referenced By
Creative Commons license
Except where otherwised noted, this item's license is described as Creative Commons Attribution 4.0 International

0000-0002-9928-2268 