Automatic Creation of 3D Documentation in CAD/BIM Based on Topology

Loading...
Thumbnail Image

Authors

Bartoněk, Dalibor

Advisor

Referee

Mark

Journal Title

Journal ISSN

Volume Title

Publisher

MDPI
Altmetrics

Abstract

This paper deals with reverse engineering, namely the as-built documentation of actual construction. The input is data measured in the field using geodetic methods. In addition to modern methods of surveying 3D objects, such as laser scanning, it is still necessary to use classic surveying using a total station. The bottleneck of the process is the creation of documentation of the construction, which is still created manually in the appropriate CAD/BIM software. The goal of this research was to find a method that would reduce the amount of manual work when drawing documentation in CAD/BIM to a minimum. The core of the solution is the use of a topology that interconnects the points measured in-field. The entire procedure has two parts: (1) creating a topological drawing template in a suitable CAD/GIS software (digital sketch) and (2) adding geometry to this sketch and creating a drawing using topological codes. This method was verified in practice by applying it to several specific buildings in the Czech Republic. The practical application of the method demonstrated 30% time savings and a reduction in work and error rate in the entire process.
This paper deals with reverse engineering, namely the as-built documentation of actual construction. The input is data measured in the field using geodetic methods. In addition to modern methods of surveying 3D objects, such as laser scanning, it is still necessary to use classic surveying using a total station. The bottleneck of the process is the creation of documentation of the construction, which is still created manually in the appropriate CAD/BIM software. The goal of this research was to find a method that would reduce the amount of manual work when drawing documentation in CAD/BIM to a minimum. The core of the solution is the use of a topology that interconnects the points measured in-field. The entire procedure has two parts: (1) creating a topological drawing template in a suitable CAD/GIS software (digital sketch) and (2) adding geometry to this sketch and creating a drawing using topological codes. This method was verified in practice by applying it to several specific buildings in the Czech Republic. The practical application of the method demonstrated 30% time savings and a reduction in work and error rate in the entire process.

Description

Citation

Mathematics. 2023, vol. 11, issue 17, p. 1-22.
https://www.mdpi.com/2227-7390/11/17/3758

Document type

Peer-reviewed

Document version

Published version

Date of access to the full text

Language of document

en

Study field

Comittee

Date of acceptance

Defence

Result of defence

Collections

Endorsement

Review

Supplemented By

Referenced By

Creative Commons license

Except where otherwised noted, this item's license is described as Creative Commons Attribution 4.0 International
Citace PRO