Comparison of the planned and actual course of construction of reinforced concrete monolithic structures
Loading...
Date
Authors
Doubek, Rostislav
Advisor
Referee
Mark
Journal Title
Journal ISSN
Volume Title
Publisher
IOP Publishing
ORCID
Altmetrics
Abstract
During construction, there is often a change in contractual terms, either in advance of construction or delayed construction. This phenomenon is due to many influencing factors such as delayed subcontracting, climatic conditions, the surrounding construction site, the quality of project documentation, the solvency of the investor, the expertise of the general contractor, etc. The aim of the paper is to assess the planned and actual construction of reinforced concrete monolithic structural elements using tower cranes. The subject of the paper is to state the expected method of implementation in time and how the construction proceeded. Milestones for accelerating and slowing down construction, analyzing their causes and proposing future measures will be presented. Data are obtained by measuring real buildings.
During construction, there is often a change in contractual terms, either in advance of construction or delayed construction. This phenomenon is due to many influencing factors such as delayed subcontracting, climatic conditions, the surrounding construction site, the quality of project documentation, the solvency of the investor, the expertise of the general contractor, etc. The aim of the paper is to assess the planned and actual construction of reinforced concrete monolithic structural elements using tower cranes. The subject of the paper is to state the expected method of implementation in time and how the construction proceeded. Milestones for accelerating and slowing down construction, analyzing their causes and proposing future measures will be presented. Data are obtained by measuring real buildings.
During construction, there is often a change in contractual terms, either in advance of construction or delayed construction. This phenomenon is due to many influencing factors such as delayed subcontracting, climatic conditions, the surrounding construction site, the quality of project documentation, the solvency of the investor, the expertise of the general contractor, etc. The aim of the paper is to assess the planned and actual construction of reinforced concrete monolithic structural elements using tower cranes. The subject of the paper is to state the expected method of implementation in time and how the construction proceeded. Milestones for accelerating and slowing down construction, analyzing their causes and proposing future measures will be presented. Data are obtained by measuring real buildings.
Description
Citation
IOP Conference Series: Materials Science and Engineering. 2021, vol. 1209, issue 1, p. 1-6.
https://iopscience.iop.org/article/10.1088/1757-899X/1209/1/012011
https://iopscience.iop.org/article/10.1088/1757-899X/1209/1/012011
Document type
Peer-reviewed
Document version
Published version
Date of access to the full text
Language of document
en
Study field
Comittee
Date of acceptance
Defence
Result of defence
Endorsement
Review
Supplemented By
Referenced By
Creative Commons license
Except where otherwised noted, this item's license is described as Creative Commons Attribution 3.0 Unported

0000-0003-1756-8084 