Analysis of construction sub-processes for the evaluation of the real performance of tower cranes

Loading...
Thumbnail Image

Authors

Doubek, Rostislav
Kurková, Dita
Štěrba, Martin
Kantová, Radka

Advisor

Referee

Mark

Journal Title

Journal ISSN

Volume Title

Publisher

IOP Publishing
Altmetrics

Abstract

The productivity of work performed at construction sites is primarily dependent on the effective deployment and use of construction machinery. Nevertheless, manufacturers do not state the actual performance of their machinery because it is difficult to determine due to its dependence on the specific conditions present at each construction site. One of the most important machines used in the construction of buildings is the tower crane, which provides secondary transport of material onsite. In order to evaluate the effectiveness of the use of such machines using a deterministic or stochastic approach, a relatively extensive and exact set of data describing the activities of a given tower crane needs to be prepared. These data describe the real requirements of ongoing construction sub-processes with regard to the utilisation of tower cranes. This contribution concerns the analysis of key construction sub-processes during the building of monolithic reinforced concrete structures in connection with secondary transport at the construction site; in particular, it describes the preparation and processing of this data for the evaluation of real time requirements placed on tower cranes.
The productivity of work performed at construction sites is primarily dependent on the effective deployment and use of construction machinery. Nevertheless, manufacturers do not state the actual performance of their machinery because it is difficult to determine due to its dependence on the specific conditions present at each construction site. One of the most important machines used in the construction of buildings is the tower crane, which provides secondary transport of material onsite. In order to evaluate the effectiveness of the use of such machines using a deterministic or stochastic approach, a relatively extensive and exact set of data describing the activities of a given tower crane needs to be prepared. These data describe the real requirements of ongoing construction sub-processes with regard to the utilisation of tower cranes. This contribution concerns the analysis of key construction sub-processes during the building of monolithic reinforced concrete structures in connection with secondary transport at the construction site; in particular, it describes the preparation and processing of this data for the evaluation of real time requirements placed on tower cranes.

Description

Citation

IOP Conference Series: Materials Science and Engineering. 2021, vol. 1203, issue 1, p. 1-14.
https://iopscience.iop.org/article/10.1088/1757-899X/1203/2/022132

Document type

Peer-reviewed

Document version

Published version

Date of access to the full text

Language of document

en

Study field

Comittee

Date of acceptance

Defence

Result of defence

Endorsement

Review

Supplemented By

Referenced By

Creative Commons license

Except where otherwised noted, this item's license is described as Creative Commons Attribution 4.0 International
Citace PRO