Výroba akvárií Popovice
but.committee | Ing.arch. Miloš Klement - předseda, doc. Ing. arch. Naděžda Menšíková, CSc. - místopředseda, Ing. arch. Yvona Boleslavská, Ph.D. - tajemník, Ing. arch Jakub Kotek - člen, doc. Ing. arch. Petr Dýr, Ph.D. - člen, Ing. Lukáš Daněk, Ph.D. - člen, | cs |
but.defence | Student Tomáš Suchanek seznámil komisi s obsahem své bakalářské práce. Na otázky a připomínky plynoucí z posudků vedoucího a oponenta a komise při odborné rozpravě nad bakalářskou prací ~Výroba akvárií Popovice~ reagoval velmi dobře. | cs |
but.jazyk | čeština (Czech) | |
but.program | Architektura pozemních staveb | cs |
but.result | práce byla úspěšně obhájena | cs |
dc.contributor.advisor | Nový, Alois | cs |
dc.contributor.advisor | Donaťáková, Dagmar | cs |
dc.contributor.author | Suchanek, Tomáš | cs |
dc.contributor.referee | Štikar, Jaroslav | cs |
dc.date.accessioned | 2019-06-14T11:36:54Z | |
dc.date.available | 2019-06-14T11:36:54Z | |
dc.date.created | 2019 | cs |
dc.description.abstract | Bakalářská práce se zabývá dokumentací pro získání stavebního povolení a dokumentací provádění stavby výroby akvárií. Práce vychází z dříve vypracované studie z předmětu AG032. Obec Popovice se nachází v okrese Uherského Hradiště, řešená parcela je téměř u jižní hranice obce. Pozemek je rovinatý a poměrně úzký, tvar pozemku značně ovlivnil rozmístění jednotlivých objektů. Nachází se v těsné blízkosti železniční stanice, je zde dobrá dostupnost pro zásobování a expedici díky blízkosti rychlostní silnice E50. Továrna se dělí na čtyři nadzemní stavební objekty, vzájemně dilatované, které vyhovují výrobním požadavkům. Všechny objekty jsou nepodsklepené a jednopodlažní. V prvním objektu na jižní části pozemku se nachází showroom výrobků a administrativní část se zázemím pro zaměstnance a návštěvy. Tento objekt je z důvodu atypického tvaru showroomu z části monolitický železobetonový a z části zděný z tvárnic systému Porotherm. Za tímto objektem je hlavní výrobní hala, do které je možno vjet nákladním automobilem a pomocí mostového jeřábu manipulovat s rozměrnými a těžkými tabulemi skla. Výrobní proces lepení má vysoké nároky na prosvětlení prostor, proto je prosvětlen jak střešními pásovými světlíky, tak velkými prosklenými plochami stěn. Tato výrobní hala přímo navazuje na prostor pro ukládání odpadů na východní straně, na straně severní navazuje na prostor stolárny. Zde se nachází i technologické zázemí obou objektů. V prostoru mezi hlavním výrobním objektem, stolárnou a ukládáním odpadů vznikl manipulační dvůr. Konstrukční systém výrobních objektů je skeletový prefabrikovaný, založen na monolitických patkách. Světlíky a strop jsou tvořeny ocelovými profily. Objekt pro ukládání odpadu má nosný systém zděný. Spojujícími prvky pro celou výrobnu jsou fasádní panely Kingspan bílé barvy. Prostor za továrnou je vyplněn zelení s parkovou úpravou a vodním prvkem. | cs |
dc.description.abstract | This bachelor thesis deals with documentation for gaining building permit approval and documentation for building aquarium factory. Thesis is based on earlier created AG032 course study. Popovice is located in Uherské Hradiště county, this parcel of land is located near south border of the county. The estate is flat and relatively narrow; therefore, the shape of the estate has influenced the placement of individual objects. The estate is near railroad station. Because of the near highway E55, the supply and dispatch accessibility is good. The factory is divided into four above-ground objects that are mutually dilated according to the production requirements. All objects do not possess a cellar. The first object is located in the southern part of the estate. In the first object there is a product showroom and administrative section with employee facilities. Due to showroom’s atypical shape, this object is partially made of reinforced concrete and partially made of Porotherm system construction blocks. The production hall is located behind this object. The access to the production hall is possible with a truck, also it is possible to manipulate heavy blocks of glass with a crane. The manufacturing process of glueing has high demands for light, therefore, the object is equipped with roof belt light well and large glass walls. This production hall is connected to waste storage unit in the east side and wood processing building on the north side. Also, there are technological facilities for both objects. The supply and dispatch area is located between the main production hall, waste storage unit and wood processing building. The construction system of production objects is skeleton, prefabricated and based on monolithic nibs. The light wells and roof are made of steel. Waste storage unit’s load-bearing system is made of bricks. Kingspan white colour facade panels are the main connecting elements throughout the whole factory. Behind the factory there is park greenery with | en |
dc.description.mark | C | cs |
dc.identifier.citation | SUCHANEK, T. Výroba akvárií Popovice [online]. Brno: Vysoké učení technické v Brně. Fakulta stavební. 2019. | cs |
dc.identifier.other | 121109 | cs |
dc.identifier.uri | http://hdl.handle.net/11012/176596 | |
dc.language.iso | cs | cs |
dc.publisher | Vysoké učení technické v Brně. Fakulta stavební | cs |
dc.rights | Standardní licenční smlouva - přístup k plnému textu bez omezení | cs |
dc.subject | Výroba akvárií | cs |
dc.subject | akvária | cs |
dc.subject | Popovice | cs |
dc.subject | továrna | cs |
dc.subject | střešní světlíky | cs |
dc.subject | fasádní panely | cs |
dc.subject | Kingspan | cs |
dc.subject | Aquarium manufacture | en |
dc.subject | Popovice | en |
dc.subject | factory | en |
dc.subject | roof light well | en |
dc.subject | facade panel | en |
dc.subject | Kingspan | en |
dc.title | Výroba akvárií Popovice | cs |
dc.title.alternative | Aquaria Production Pavlica | en |
dc.type | Text | cs |
dc.type.driver | bachelorThesis | en |
dc.type.evskp | bakalářská práce | cs |
dcterms.dateAccepted | 2019-06-04 | cs |
dcterms.modified | 2019-06-14-14:51:25 | cs |
eprints.affiliatedInstitution.faculty | Fakulta stavební | cs |
sync.item.dbid | 121109 | en |
sync.item.dbtype | ZP | en |
sync.item.insts | 2020.04.01 02:11:09 | en |
sync.item.modts | 2020.03.31 23:49:23 | en |
thesis.discipline | Architektura pozemních staveb | cs |
thesis.grantor | Vysoké učení technické v Brně. Fakulta stavební. Ústav architektury | cs |
thesis.level | Bakalářský | cs |
thesis.name | Bc. | cs |
Files
Original bundle
1 - 5 of 5
Loading...
- Name:
- final-thesis.pdf
- Size:
- 345.18 KB
- Format:
- Adobe Portable Document Format
- Description:
- final-thesis.pdf
Loading...
- Name:
- Posudek-Vedouci prace-47623.pdf
- Size:
- 958.71 KB
- Format:
- Adobe Portable Document Format
- Description:
- Posudek-Vedouci prace-47623.pdf
Loading...
- Name:
- Posudek-Oponent prace-47624.pdf
- Size:
- 941.01 KB
- Format:
- Adobe Portable Document Format
- Description:
- Posudek-Oponent prace-47624.pdf
Loading...
- Name:
- review_121109.html
- Size:
- 1.62 KB
- Format:
- Hypertext Markup Language
- Description:
- review_121109.html